*NOTE: This website was designed for best viewing in MS Internet Explorer v6.0*

Highland Park Dam Mitigation Project

These photos were taken during the installation of the native gardens that were part of the Highland Park Dam Mitigation Project in August 2008. Photos have been provided by PCS staff and other project partners.







Photo Album of Post-Construction
Upstream structure looking west
Downstream structure from upstream
Pre-construction
Pre-construction
US (9-5-08)
DS (9-5-08)
US (9-13-08)
DS (9-13-08)
Image not Available
DS (9-18-08)
US (11-5-08)
DS (11-5-08)
US (1-27-09)
DS (1-27-09)
US (2-12-09)
DS (2-12-09)
US (3-19-09)
DS (3-19-09)




Photo Album of Additonal Post Construction
Storm flooding
2-19-09
Sand deposits from Feb storm
3-19-09